{"id":13538,"date":"2021-12-13T10:27:34","date_gmt":"2021-12-13T09:27:34","guid":{"rendered":"https:\/\/www.qintesi.com\/?post_type=portfolio&#038;p=13538"},"modified":"2022-05-04T17:21:41","modified_gmt":"2022-05-04T15:21:41","slug":"investment-management-with-sap-project-system","status":"publish","type":"portfolio","link":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/","title":{"rendered":"Investment management with SAP Project System"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"13538\" class=\"elementor elementor-13538 elementor-13537\" data-elementor-post-type=\"portfolio\">\n\t\t\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-ff1544b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"ff1544b\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2533ac9e\" data-id=\"2533ac9e\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-460539fb elementor-widget elementor-widget-text-editor\" data-id=\"460539fb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h4>Challenge<\/h4><p>The group, an important international player in the\u00a0<b>Chemical &amp; Pharma<\/b>\u00a0sector, needed to re-engineer the investment management process to:<\/p><ul><li aria-level=\"1\">allow an analysis by macro-family of investments<\/li><li aria-level=\"1\">detail the level of planning by type of investment with greater depth<\/li><li aria-level=\"1\">monitor the budget, final balance and Cash Out values \u200b\u200bfor investment and investment family<\/li><li aria-level=\"1\">limit, lighten or even cancel the manual activities of the Project Controllers and the administration<\/li><\/ul><h4>\u00a0<\/h4><h4>Solution<\/h4><p>In order to meet the requirements, the following areas for improvement were identified, which, shared and approved by the customer, led to the implementation of the\u00a0<b>Project System\u00a0<\/b>module:<\/p><ul><li aria-level=\"1\">the registry structures of the investment objects (internal orders) did not reflect the real need for classification and detail<\/li><li aria-level=\"1\">some procedures required methods performed outside the SAP standard<\/li><li aria-level=\"1\">the detailed analyzes for each investment project were carried out extra-SAP with a consequent high time-consuming<\/li><li aria-level=\"1\">project Cash Out was not available from the system<\/li><\/ul><p>\u00a0<\/p><p>The implemented solution followed the guidelines:<\/p><ul><li aria-level=\"1\"><b>Process standardization<\/b>: adopting a solution as much in line as possible with the current budget approval process and start of the investment initiative, with attention to back-to-standard where possible.<\/li><li aria-level=\"1\"><b>Advanced features<\/b>: introducing the standard SAP solution to manage complex projects and allow a hierarchical analysis of the same, using the functionality of the SAP Project System (PS).<\/li><li aria-level=\"1\"><b>Process improvement<\/b>: adopting the required planning detail (annual, monthly) within SAP S\/4HANA to reduce manual analyzes on an excel basis.<\/li><li aria-level=\"1\"><b>Real-time and more accurate project analysis<\/b>: activating the standard functions to allow the evaluation of the order cash out.<\/li><li aria-level=\"1\"><b>Group model<\/b>: defining a valid model that can be extended to all Group companies.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-5c2f7459 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"5c2f7459\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-407e900f\" data-id=\"407e900f\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-376fe71b elementor-widget elementor-widget-heading\" data-id=\"376fe71b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h4 class=\"elementor-heading-title elementor-size-default\">Results<\/h4>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-10104632 elementor-align-start elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"10104632\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-check\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Detailed investment project according to the depth of analysis required by the type<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-check\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Reduction in the use of custom procedures<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-check\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">System data consolidation and integration with Group reporting systems<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<i aria-hidden=\"true\" class=\"fas fa-check\"><\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Real-time monitoring of the values \u200b\u200bof: Budget, Committed, Final Balance, Paid<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-261bf772 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"261bf772\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-30ccd711\" data-id=\"30ccd711\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6554ecb6 elementor-widget elementor-widget-heading\" data-id=\"6554ecb6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h4 class=\"elementor-heading-title elementor-size-default\">Statement<\/h4>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2a6001c1 elementor-widget elementor-widget-testimonial\" data-id=\"2a6001c1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"testimonial.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-wrapper\">\n\t\t\t\t\t\t\t<div class=\"elementor-testimonial-content\">The Project has introduced new features for the Customer in a process that has already been consolidated for some time: the entire team, of Qintesi and of the Customer together, worked to bring together the needs of reporting, standardization and flexibility of the solution, allowing monitoring of the entire life of the investment in SAP S\/4HANA.<\/div>\n\t\t\t\n\t\t\t\t\t\t<div class=\"elementor-testimonial-meta elementor-has-image elementor-testimonial-image-position-aside\">\n\t\t\t\t<div class=\"elementor-testimonial-meta-inner\">\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-image\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.qintesi.com\/wp-content\/uploads\/2021\/12\/Trezzi-Laura_Linkedin-150x150-1.png\" class=\"attachment-full size-full wp-image-20137\" alt=\"\" \/>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-details\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-name\">Laura Trezzi<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"elementor-testimonial-job\">Manager - Qintesi<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section data-particle_enable=\"false\" data-particle-mobile-disabled=\"false\" class=\"elementor-section elementor-top-section elementor-element elementor-element-e9d5880 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"e9d5880\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-6559ef3e\" data-id=\"6559ef3e\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-3deac9bb elementor-widget elementor-widget-text-editor\" data-id=\"3deac9bb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Le informazioni contenute in questo documento sono di propriet\u00e0.<br \/>Copyright \u00a9 2014 Qintesi S.p.A. Tutti i diritti riservati.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Challenge The group, an important international player in the\u00a0Chemical &amp; Pharma\u00a0sector, needed to re-engineer the investment management process to: allow an analysis by macro-family of investments detail the level of planning by type of investment with greater depth monitor the budget, final balance and Cash Out values \u200b\u200bfor investment and investment family limit, lighten or [&hellip;]<\/p>","protected":false},"author":3,"featured_media":20131,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"_vp_format_video_url":"","_vp_image_focal_point":[],"footnotes":""},"portfolio_category":[],"portfolio_tag":[],"servizi-offerti":[808],"moduli_implementati":[813,814],"settore":[832],"class_list":["post-13538","portfolio","type-portfolio","status-publish","format-standard","has-post-thumbnail","hentry","servizi-offerti-digital-transformation","moduli_implementati-sap-project-system-en","moduli_implementati-sap-investment-management-en","settore-pharma-chemicals-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Investment management with SAP Project System - Qintesi<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Investment management with SAP Project System - Qintesi\" \/>\n<meta property=\"og:description\" content=\"Challenge The group, an important international player in the\u00a0Chemical &amp; Pharma\u00a0sector, needed to re-engineer the investment management process to: allow an analysis by macro-family of investments detail the level of planning by type of investment with greater depth monitor the budget, final balance and Cash Out values \u200b\u200bfor investment and investment family limit, lighten or [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/\" \/>\n<meta property=\"og:site_name\" content=\"Qintesi\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-04T15:21:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.qintesi.com\/wp-content\/uploads\/2021\/12\/La-gestione-degli-investimenti-con-SAP-Project-System_Miniatura.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"876\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/en\\\/portfolio\\\/investment-management-with-sap-project-system\\\/\",\"url\":\"https:\\\/\\\/www.qintesi.com\\\/en\\\/portfolio\\\/investment-management-with-sap-project-system\\\/\",\"name\":\"Investment management with SAP Project System - Qintesi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/en\\\/portfolio\\\/investment-management-with-sap-project-system\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/en\\\/portfolio\\\/investment-management-with-sap-project-system\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.qintesi.com\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/La-gestione-degli-investimenti-con-SAP-Project-System_Miniatura.png\",\"datePublished\":\"2021-12-13T09:27:34+00:00\",\"dateModified\":\"2022-05-04T15:21:41+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/en\\\/portfolio\\\/investment-management-with-sap-project-system\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.qintesi.com\\\/en\\\/portfolio\\\/investment-management-with-sap-project-system\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/en\\\/portfolio\\\/investment-management-with-sap-project-system\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.qintesi.com\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/La-gestione-degli-investimenti-con-SAP-Project-System_Miniatura.png\",\"contentUrl\":\"https:\\\/\\\/www.qintesi.com\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/La-gestione-degli-investimenti-con-SAP-Project-System_Miniatura.png\",\"width\":1920,\"height\":876},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/en\\\/portfolio\\\/investment-management-with-sap-project-system\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.qintesi.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Portfolio Items\",\"item\":\"https:\\\/\\\/www.qintesi.com\\\/portfolio\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Investment management with SAP Project System\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/#website\",\"url\":\"https:\\\/\\\/www.qintesi.com\\\/\",\"name\":\"Qintesi\",\"description\":\"People shaping solutions.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.qintesi.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/#organization\",\"name\":\"Qintesi\",\"url\":\"https:\\\/\\\/www.qintesi.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.qintesi.com\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/qintesi_logo.png\",\"contentUrl\":\"https:\\\/\\\/www.qintesi.com\\\/wp-content\\\/uploads\\\/2022\\\/03\\\/qintesi_logo.png\",\"width\":908,\"height\":681,\"caption\":\"Qintesi\"},\"image\":{\"@id\":\"https:\\\/\\\/www.qintesi.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Investment management with SAP Project System - Qintesi","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/","og_locale":"en_US","og_type":"article","og_title":"Investment management with SAP Project System - Qintesi","og_description":"Challenge The group, an important international player in the\u00a0Chemical &amp; Pharma\u00a0sector, needed to re-engineer the investment management process to: allow an analysis by macro-family of investments detail the level of planning by type of investment with greater depth monitor the budget, final balance and Cash Out values \u200b\u200bfor investment and investment family limit, lighten or [&hellip;]","og_url":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/","og_site_name":"Qintesi","article_modified_time":"2022-05-04T15:21:41+00:00","og_image":[{"width":1920,"height":876,"url":"https:\/\/www.qintesi.com\/wp-content\/uploads\/2021\/12\/La-gestione-degli-investimenti-con-SAP-Project-System_Miniatura.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/","url":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/","name":"Investment management with SAP Project System - Qintesi","isPartOf":{"@id":"https:\/\/www.qintesi.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/#primaryimage"},"image":{"@id":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/#primaryimage"},"thumbnailUrl":"https:\/\/www.qintesi.com\/wp-content\/uploads\/2021\/12\/La-gestione-degli-investimenti-con-SAP-Project-System_Miniatura.png","datePublished":"2021-12-13T09:27:34+00:00","dateModified":"2022-05-04T15:21:41+00:00","breadcrumb":{"@id":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/#primaryimage","url":"https:\/\/www.qintesi.com\/wp-content\/uploads\/2021\/12\/La-gestione-degli-investimenti-con-SAP-Project-System_Miniatura.png","contentUrl":"https:\/\/www.qintesi.com\/wp-content\/uploads\/2021\/12\/La-gestione-degli-investimenti-con-SAP-Project-System_Miniatura.png","width":1920,"height":876},{"@type":"BreadcrumbList","@id":"https:\/\/www.qintesi.com\/en\/portfolio\/investment-management-with-sap-project-system\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.qintesi.com\/"},{"@type":"ListItem","position":2,"name":"Portfolio Items","item":"https:\/\/www.qintesi.com\/portfolio\/"},{"@type":"ListItem","position":3,"name":"Investment management with SAP Project System"}]},{"@type":"WebSite","@id":"https:\/\/www.qintesi.com\/#website","url":"https:\/\/www.qintesi.com\/","name":"Qintesi","description":"People shaping solutions.","publisher":{"@id":"https:\/\/www.qintesi.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.qintesi.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.qintesi.com\/#organization","name":"Qintesi","url":"https:\/\/www.qintesi.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qintesi.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.qintesi.com\/wp-content\/uploads\/2022\/03\/qintesi_logo.png","contentUrl":"https:\/\/www.qintesi.com\/wp-content\/uploads\/2022\/03\/qintesi_logo.png","width":908,"height":681,"caption":"Qintesi"},"image":{"@id":"https:\/\/www.qintesi.com\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/portfolio\/13538","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/comments?post=13538"}],"version-history":[{"count":0,"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/portfolio\/13538\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/media\/20131"}],"wp:attachment":[{"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/media?parent=13538"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/portfolio_category?post=13538"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/portfolio_tag?post=13538"},{"taxonomy":"servizi-offerti","embeddable":true,"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/servizi-offerti?post=13538"},{"taxonomy":"moduli_implementati","embeddable":true,"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/moduli_implementati?post=13538"},{"taxonomy":"settore","embeddable":true,"href":"https:\/\/www.qintesi.com\/en\/wp-json\/wp\/v2\/settore?post=13538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}